Presidential Palace
Abu Dhabi

277 O2PRIME-IBAR Systems Throughout Palace
Over 4,000 Tons Cooling Capacity

Tampa Bay Times Forum
Tampa, Florida

Over 700 Ton Reduction
(12) 40,000 CFM Air Handlers with O2PRIME-IBARS

Year Renovated – 2011
Square Footage – 670,000
Maximum Occupancy – 21,500
Cooling Load Reduction – 700 TONS
Air Handlers – (12) 40,000 CFM AHU’S
GPS Products Used – (24) GPS-IBAR’S
Renovation Savings – > 1 MILLION
Energy Savings – $115,500.00

Valencia College

Independent Testing Results:

0 Bacteria
0 Fungi
Throughout Entire Depth Of Cooling Coil